Deck Material & Cost Calculator
Estimate decking, framing, footings, concrete, hardware, and an editable material budget from one deck layout.
Save this estimate
Projects are stored only in this browser on this computer. No account is required.
Project information
OptionalAdd these details only if you want them included on the printable project summary. You can leave every field blank.
Project details
Enter deck dimensions, decking, framing, and footing assumptions.
One footing is assumed for each post. Enter the planned cylindrical footing size.
Build your budget
Start with a preset and replace prices with your local supplier pricing.
Concrete estimate
Estimated material cost
Estimated materials
How the footing calculation works
Projometry assumes one cylindrical concrete footing for each post. Concrete volume is calculated from the entered footing diameter and depth.
The selected concrete waste allowance is added before converting the required volume into bag quantities.
Approximate bag yields used for planning are 0.30 cubic feet for a 40-pound bag, 0.45 cubic feet for a 60-pound bag, and 0.60 cubic feet for an 80-pound bag.
These calculations estimate material quantity only. Required footing dimensions vary with loads, soil, frost depth, deck geometry, and applicable building codes.
Deck Project Summary
Material and cost planning estimate